Search This Blog

Saturday, January 22, 2011

Syndetic

We have been running of Derek's 2.8kW generator.  We have most equipment wonstream of one of those 6 way power boards with an overload circuit.  The servers are up stream of it.  That way if the downstream load exceeds 2400W, the 6 way board overload trips but the servers stay up.  The Laser printer seems to be a big user of power and makes the generator labor.  We have only 4 benches powered up and no main lights and no aircon.

We have a gas bottle and saucepan to boil water for coffee.  An Esky and ice to keep milk and water cold.

Energex are installing a new power pole and transformer across the road.  A new feeder cable is being installed to the building.  The huge old transformer under PDB in the EM building is being decomissioned.  

Monday we are told power will be on.  They are working hard so here is hoping.

No comments:

Post a Comment